Precision Engineered Infrastructure

The Architecture of Modern Industry

One Ten Technologysupplies high-tolerance hardware and automated control systems to manufacturing leaders worldwide. Since 1996, we have set the standard for industrial reliability.

28
Years in operation
1,240+
Installations delivered
40
Countries served
99.2%
On-time delivery

Independently certified, continuously audited, and trusted on production-critical equipment by manufacturers in 40 countries.

  • ISO 9001:2015
  • ISO 45001
  • IATF 16949
  • CE Marked
  • ATEX Zone 1
  • MERIDIAN STEEL
  • AERODYNE
  • NORTHPORT ENERGY
  • KALTEX
  • ORBITAL MOTORS
  • About Us

    An engineering company, run by engineers.

    We design, manufacture and support the equipment our customers cannot afford to have stop. Our mission is straightforward: keep production lines running to specification, for decades rather than warranty periods.

    Mission

    MissionDeliver measurable availability to every production line we touch.

    Vision
    VisionTo be the supplier manufacturers name first when reliability is non-negotiable.
    Product Catalog

    Mission-Critical Systems

    Sensing & Optics

    Sub-millimetre precision tracking for automated logistics and high-speed inspection environments.

    Robotics

    Heavy-lift synchronous robotics with integrated thermal feedback and closed-loop joint control.

    Control Systems

    Edge computing module for real-time industrial process optimisation and closed-loop control.

    Operational Excellence

    Engineered to withstand the most demanding environments.

    We don't just manufacture hardware; we design integrated solutions that reduce downtime by an average of 32% across our client portfolio.

    Industry expertise

    Nearly three decades across energy, automotive, food processing and heavy manufacturing lines.

    Certified quality

    Every unit clears a 40-point acceptance protocol before it leaves our facility.

    Fast response

    Formal quotations within 48 hours and on-site support SLAs across 40 countries.

    Customer-focused

    A dedicated account engineer assigned to every installation, for the life of the asset.

    Q3 Programme

    Complimentary line efficiency audit

    Book a technical audit before 30 September and receive a written efficiency report with a costed upgrade path — at no charge for qualifying facilities.

    Client Feedback
    “One Ten's manifolds have run 40,000 hours without a single unplanned stop. The tolerances are exactly as specified, batch after batch.”

    D. Okafor

    Plant Director, Meridian Steel

    Frequently Asked

    Answers before you ask.

    Cannot find what you need? Our technical desk answers directly.

    How quickly can I receive a formal quotation?

    Standard catalogue items are quoted within 48 working hours. Engineered-to-order systems typically require 5–7 working days for a costed technical proposal, including a preliminary schedule.

    Yes. Every capital equipment order includes optional supervised installation, commissioning and operator training delivered by our field engineering group in 40 countries.

    Our manufacturing operations are certified to ISO 9001:2015, ISO 45001 and IATF 16949. Individual products carry CE marking, and selected assemblies are ATEX Zone 1 rated.

    Stocked components ship in 3–5 working days. Standard assemblies run 4–6 weeks, and fully engineered systems 10–16 weeks depending on scope and validation requirements.

    We maintain drawings and spares availability for every unit we have shipped since 1996. Provide your serial number and we will confirm availability the same day.

    Resources

    Industry insight

    Industry Insight

    Across 1,240 installations we found that four failure modes account for more than two thirds of unplanned stoppages. Here is what they are and how to design them out.

    7 min read
    Guides

    How to write an automation specification that gets you comparable quotations, protects your schedule and leaves you owning the documentation.

    9 min read
    Guides

    Traceability failures, not process failures, cause most audit findings. A practical checklist for keeping manufacturing records defensible.

    6 min read

    Ready to optimise your operations?

    Request a technical consultation with one of our lead engineers to discuss your project requirements.